Shipping Advice and Sea Waybill Consistency Checklist: 30 Cross-Checks Before the Goods Sail

Read the shipping advice against the sea waybill before the goods sail: the shipper, the consignee, the notify party, the piece count, the weights, the volume, the goods description, the vessel, the voyage, the sea waybill number, the freight term, the ports and the estimated arrival.
How to use this checklist
This page covers the reading of a shipping advice against the sea waybill only: the parties, the piece count, the weights, the volume, the goods description, the vessel, the voyage, the sea waybill number, the freight term, the release arrangement, the ports, the estimated arrival, the documents enclosed and the notice recipients.
Work through the four stages in order, with both papers open on the desk, reading every line on the advice against the line that answers it on the waybill.
Each party sees a different part of the shipment: tell each party where one reads differently.
Stage 1 — Shipper, consignee and notify party
Stage 1 covers the parties.
Read them first.
Stage 2 — Piece count, weights, volume, goods description and marks
Stage 2 covers the quantities and the marks.
Read them first.
Stage 3 — Sea waybill number, vessel, voyage, ports and estimated arrival
Stage 3 covers the number, the vessel and the arrival.
Read it first.
Stage 4 — Freight term, release arrangement, copies, documents enclosed, notice recipients and sending point
Stage 4 covers the terms and the advice itself.
Read them first.
Reading the vessel, the voyage, the sea waybill number and the estimated arrival as one line from the shipping advice to the sea waybill
The two papers are read as one line: the shipping advice is the notice sent after the goods have shipped, and the sea waybill is the carrier paper that lets the named consignee take the goods at the destination. Read the sea waybill number against the bill of lading number first: where the two numbers point at different shipments, the papers say nothing until the carrier confirms it.
The sea waybill number and the bill of lading number are the first place the line parts ways. The waybill carries its own number: the sea waybill number is read against the bill of lading number on the advice. The advice names no sea waybill number line of its own.
The shipper, the consignee and the notify party are the next place the line parts ways. The waybill names the shipper, the consignee and the notify party; the advice names the consignee, the notify party and the forwarder as the parties it notifies. The consignee is read against the consignee, and the notify party against the notify party. The shipper the waybill names has no party line on the advice: the shipper is read against the notice recipients and the sending point the advice names.
The piece count, the weights, the volume, the goods description and the marks and numbers are the next place the line parts ways. The waybill names the piece count, the goods description, the container number and the marks and numbers; the advice names the piece count, the marks and numbers and the cargo description. The goods description, the piece count and the marks and numbers are read against the same lines. The weights and the volume have no line on the advice: they are read against the goods the advice names. The seal number the advice names has no line on the waybill.
The vessel, the voyage, the flight number and the ports are the next place the line parts ways. The advice names the vessel, the voyage, the flight number and the ports, and the waybill names the vessel, the voyage and the ports. The vessel is read against the vessel, the voyage against the voyage, and each port against the port of the same name. The flight number on the advice answers for no vessel: it is read against the vessel and the voyage named on the waybill. The airports the advice names have no line on the waybill. No departure estimate is named on either paper: the departure is read from the vessel, the voyage and the port of loading.
The estimated arrival is the next place the line parts ways, and it is the line where the two papers differ in kind. The advice is sent after the goods have shipped, so the estimated arrival is a later reading than the vessel and the voyage the waybill names: it is read against the vessel, the voyage and the port of discharge named on the waybill. The sea waybill names no estimated arrival line of its own.
The freight term is the next place the line parts ways. The waybill names the freight term, and the advice names no freight term line of its own: the freight term is read against the shipment the advice names. Where it reads differently, ask the carrier which terms stand.
The release arrangement, the copies, the documents enclosed, the notice recipients and the sending point are the last place the line parts ways. The waybill names the release arrangement, and the advice names no release arrangement line of its own: the release arrangement is read against the shipment the advice names. The advice names the documents enclosed, the notice recipients and the sending point: the documents enclosed are read against the shipment the waybill names, the notice recipients against the parties, and the sending point against the port of loading. The copies enclosed with the advice are read against the copies named on the waybill.
The vessel, the voyage, the sea waybill number, the freight term, the release arrangement and the estimated arrival are read together.
Which line on the sea waybill to settle first when the shipping advice names it differently
A party that reads differently is settled with the shipper; a number line that reads differently is settled with the carrier.
| Difference found | When it applies | What to do first |
|---|---|---|
| Party reading differently from the party on the waybill | The two papers name different parties | Ask the shipper and the forwarder in writing which party stands |
| Sea waybill number reading differently from the bill of lading number on the advice | The two papers answer for the same shipment under different numbers | Ask the carrier in writing which number stands |
| Estimated arrival reading differently from the vessel and the voyage named on the waybill | The two papers answer for the same vessel and voyage with different arrivals | Ask the carrier in writing which arrival stands |
| Freight term reading differently from the shipment the advice names | The two papers answer for the same shipment on different terms | Ask the carrier in writing which terms stand |
| Release arrangement reading differently from the shipment the advice names | The two papers answer for the same shipment with different release terms | Ask the carrier in writing which release terms stand |
Why a shipping advice and the sea waybill are sent back for correction after the goods have shipped
Most corrections come back to a few causes. A party is named that the advice does not name, so the notice goes to a party the other paper never named. A quantity is stated that the advice does not state, so the waybill answers for pieces never named.
The fix is the same in each case: name the line, name the paper that agrees it, and put the answer on the file.
Second is a mark the waybill does not carry, third a weight they do not support, and fourth an arrival they do not answer for.
A fifth cause is an advice handed over with no waybill beside it. Keep the two papers in one file.
What this shipping advice and sea waybill comparison leaves open for the carrier and the consignee
This checklist cannot decide whether a vessel named on the waybill will sail as named: the carrier and the forwarder decide.
It also cannot replace carrier, forwarder or consignee advice on a specific pair of papers. Where either paper names a step this checklist does not cover, ask the carrier.
It also cannot say whether the cargo inside the cartons matches the advice: that rests with the loading record.
Export documents guides on this site
- Sea Waybill and Bill of Lading Consistency Checklist: 30 Cross-Checks Before the Goods Sail
- Sea Waybill and Certificate of Origin Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Insurance Certificate Consistency Checklist: 30 Cross-Checks Before the Goods Sail
- Sea Waybill and Export Declaration Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Export Tax Rebate Documents Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Packing List Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
Related guides
- Sea Waybill and Bill of Lading Consistency Checklist: 30 Cross-Checks Before the Goods Sail
- Sea Waybill and Certificate of Origin Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Insurance Certificate Consistency Checklist: 30 Cross-Checks Before the Goods Sail
- Sea Waybill and Export Declaration Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Export Tax Rebate Documents Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
- Sea Waybill and Packing List Consistency Checklist: 30 Cross-Checks Before the Waybill Is Signed
Official references
- US Customs and Border Protection: Trade
- ICC: Incoterms 2020
- FIATA: International Federation of Freight Forwarders Associations
- IATA: Cargo
For a route-specific logistics review, provide the product, origin, destination, packed dimensions, weight and ready date.
Request a shipment review ↗Frequently asked questions
What should be checked first when a shipping advice is read against the sea waybill?
Read the parties first, then the piece count, the weights, the volume and the goods description, then the sea waybill number, the vessel, the voyage and the ports, then the freight term, the release arrangement, the estimated arrival, the documents enclosed and the notice recipients.
What should be done when the sea waybill number on the sea waybill reads differently from the bill of lading number on the shipping advice?
Ask the carrier in writing which number stands, and put the answer on the file before the goods sail. The sea waybill number has to answer for the shipment named: where the two papers name different numbers, the waybill points at a shipment the advice does not name. Where the waybill names no sea waybill number yet, read the number when the sea waybill is issued and correct the advice in writing.
How does the estimated arrival on a shipping advice connect with the sea waybill?
Read the estimated arrival on the advice against the vessel and the voyage named on the waybill and against the port of discharge named on the waybill: the advice is sent after the goods have shipped, so the estimated arrival is a later reading than the vessel and the voyage. Where the expected date reads later than the vessel and the voyage the waybill names, tell the consignee in writing.