ANELGO GLOBAL LOGISTICS
Shipping guides / Guides · Sourcing LCL consolidation guide

Sourcing Inspection Sampling Guide: From the First Carton Draw to the Inspection Report

Guides · Sourcing LCL consolidation guide · Reviewed November 22, 2026 · 10 minute read

An inspector at a consolidation warehouse opening plain cartons on a sample draw beside a blank clipboard and an inspection record sheet, in muted blue-grey and soft ochre
Illustrative AI-generated image.

Inspecting arrived goods on a sample draw follows one process from the first carton to the report: set the sampling plan, draw the sample across the cartons, grade what the draw shows, and write the report that carries the acceptance decision. This guide walks through each stage in order.

How to use this guide

This guide covers arrival inspection sampling only: setting the sampling plan, drawing the sample, grading the defects, checking the cartons on site, and writing the inspection report. It does not repeat the supplier qualification checklist, which covers licences and registration before the first order, or the cargo damage inspection checklist, which covers damage found at arrival and the survey report.

Work through the five stages in order, and do not grade the goods until the sample is drawn across the cartons. A sample drawn from one corner of the load says nothing about the cartons it never touched. The sampling plan is the only record the buyer, the supplier and the inspector all read.

Each drawn carton keeps its own record: note the carton, the goods inside, the defect grade and the check beside the carton number before moving to the next. A drawn carton with no record is a carton the inspection report cannot answer for.

Stage 1 — Setting the sampling plan before the goods arrive

Agree the sampling plan with the supplier and the buyer before the goods arrive: which cartons the draw takes, how the draw spreads across the cartons, and what the inspector reads in each drawn carton. Put the plan in writing, and share it with the warehouse, so the draw at arrival follows the plan the buyer and the supplier both agreed.

Draw the sample at random, so it reaches every part of the load: cartons from each supplier, cartons from the front and the back of the load, and cartons from the top and the bottom of the stack. A draw that takes only the cartons nearest the door reads only the cartons nearest the door, and the rest of the load goes unread.

Stage 2 — Drawing the sample at arrival

Draw the sample at the warehouse door when the goods arrive, following the plan: open the cartons the plan names, in the order the plan names them, and set each drawn carton apart with its carton number showing. Do not swap a drawn carton for a carton nearer the door: a swapped carton breaks the draw the buyer and the supplier agreed.

Read the goods inside each drawn carton against the order: the product, the finish, the packing and the marks. Note what the carton holds beside its carton number, and keep the drawn cartons apart from the cartons still sealed, so a later reader can tell which cartons the draw touched and which it never opened.

Stage 3 — Grading the defects the draw shows

Grade each defect the draw shows by what it does to the goods: a defect that stops the goods from working or makes them unsafe to use, a defect that mars the goods or weakens the packing, and a mark that reads wrong on the carton. Name the grade beside the carton number, and write what the defect is in plain words, so the buyer reads the grade and the defect together.

Read the grades across the whole draw before deciding anything: one defect in one carton reads differently from the same defect in carton after carton. Where the same defect shows in carton after carton, note it as a pattern, and ask the supplier what changed in the goods.

Stage 4 — Field checks at the warehouse

Check the cartons on site against the order sheet: count the cartons for every supplier, read the marks on the cartons, and read the packing list beside the cartons as they stand. Set apart any carton whose marks or count do not match the list, and note the carton number beside the mismatch, so the report can name the carton that did not match.

Look at the packing inside the drawn cartons: the goods wrapped as the order names, the marks readable on the carton, and the carton sealed as the supplier left it. Where a drawn carton arrives open or its packing reads differently from the order, note it on the record, and ask the supplier which packing stands on the order.

Stage 5 — The inspection report and the acceptance decision

Write the inspection report from the records the draw made: the sampling plan, the cartons drawn, the goods inside each drawn carton, the defect grades, and the field checks at the warehouse. Read the report against the order before it leaves the warehouse: the supplier name, the product, the carton count and the marks, each as the order names them.

The acceptance decision follows the report: where the drawn goods match the order, the load stands as accepted; where the grades show a pattern the order cannot carry, the buyer holds the load and asks the supplier in writing what stands on the order. The report is the only record the buyer, the supplier and the inspector all read.

Reading the sampling plan, the draw, the defect grades and the report as one line from the first carton to the acceptance decision

An arrival inspection on a sample draw is different from an inspection that opens every carton: the draw stands for the load, and the load is read through the cartons the draw touched. The sampling plan is what makes the draw stand for the load, and the plan is agreed before the goods arrive, not drawn up after the cartons are already open.

The draw is spread across the load because a load is not one carton repeated: cartons from each supplier, cartons from the front and the back of the load, and cartons from the top and the bottom of the stack. The plan names which cartons the draw takes, and the inspector follows the plan, so the draw the buyer reads is the draw the supplier agreed.

Defect grades are read by what the defect does, not by counting alone: a defect that stops the goods from working or makes them unsafe to use reads differently from a defect that mars the finish or weakens the packing, and both read differently from a mark that reads wrong on the carton. The grade is written beside the carton number in plain words, so the buyer reads the grade and the defect together, and the supplier reads the same grade on the same carton.

A single defect in a single carton reads as a single carton fault; the same defect in carton after carton reads as a pattern, and a pattern asks a different question: what changed in the goods before the load left the supplier. The inspector notes the pattern on the record and names the cartons that carry it, so the buyer does not treat a pattern as a run of single faults, and the supplier is asked about the goods, not about one carton.

The field checks at the warehouse are read beside the draw, not instead of it: the carton count for every supplier, the marks on the cartons, the packing list beside the cartons as they stand, and the packing inside the drawn cartons. A carton whose marks or count do not match the list is set apart and named by its carton number, so the report can say which carton did not match and the buyer can ask the supplier about that carton, not about the load as a whole.

The inspection report is written from the records the draw made, and it is written once: the sampling plan, the cartons drawn, the goods inside each drawn carton, the defect grades, and the field checks at the warehouse. The report is read against the order before it leaves the warehouse, and the buyer, the supplier and the inspector all read the same report.

The sampling plan, the draw, the defect grades and the report are read together. The plan ties each drawn carton to the load, the draw ties the goods to the cartons, the grades tie each defect to its carton, the field checks tie the cartons to the order, and the report ties the whole draw back to the acceptance decision. Where any link in that line is missing, the report cannot answer for the goods, and the missing link is settled at the warehouse before the load is accepted.

Which inspection difference to settle first when the drawn goods and the order do not match

A defect difference is settled at the warehouse; a load difference is settled against the order sheet.

Difference foundWhen it appliesWhat to do first
A defect shows in carton after cartonThe same defect repeats across the drawAsk the supplier in writing what changed in the goods
A drawn carton holds goods that differ from the orderThe goods inside the carton do not match the order sheetAsk the supplier to show goods that match the order
The carton count does not match the order sheetThe cartons counted at the door do not match the cartons the order namesAsk the supplier in writing which cartons stand on the delivery
The marks on the cartons read differently from the listThe carton marks name a product the list never namedCompare the marks, the packing list and the order before grading the cartons
The report and the order name different cartonsThe inspection report and the order sheet disagree on the cartons drawnAsk the inspector in writing which cartons stand on the report

Why an arrival inspection is held back before the goods are accepted

Most holds come back to a few causes. A sample is drawn from the cartons nearest the door, so the draw reads only the cartons nearest the door. A defect grade is written without the carton number, so the report cannot name the carton that carried it. A carton is graded before its draw is finished, so the grade reads one carton as the whole load.

The fix is the same in each case: name the carton, name the grade, and put the answer on the record before the load is accepted.

Second is a carton count that does not match the order sheet, third a mark the cartons do not carry, and fourth a report that names cartons the draw never touched.

What this sourcing inspection sampling guide leaves open for the buyer and the inspector

This guide cannot decide whether a supplier will hold the goods until the load is accepted: the supplier decides, and the buyer confirms it in writing with the supplier.

It also cannot replace inspector or buyer advice on a specific order. Where a supplier names a step this guide does not cover, ask the inspector.

It also cannot say whether the goods inside the cartons the draw never touched match the order: that rests with the draw the plan names.

Sourcing and consolidation guides on this site

Related guides

Official references

Note: This guide provides general logistics planning information. It is not legal, customs, tax, safety or carrier acceptance advice. Requirements, services and schedules depend on the actual goods, route, contract, provider and current rules. Verify shipment-specific questions with the responsible carrier, customs broker or authority before dispatch.

For a route-specific logistics review, provide the product, origin, destination, packed dimensions, weight and ready date.

Request a shipment review ↗

Frequently asked questions

What should be settled first when inspecting arrived goods on a sample draw?

Settle the sampling plan first: agree with the supplier and the buyer which cartons the draw takes, how the draw spreads across the cartons, and what the inspector reads in each drawn carton — and put the plan in writing before the goods arrive, so the draw at arrival follows the plan the buyer and the supplier both agreed.

How should defects found in the drawn cartons be graded?

Grade each defect by what it does to the goods: a defect that stops the goods from working or makes them unsafe to use, a defect that mars the goods or weakens the packing, and a mark that reads wrong on the carton — and write the grade beside the carton number in plain words, so the buyer reads the grade and the defect together.

What should be done when the drawn goods do not match the order?

Ask the supplier in writing what changed in the goods, and where the supplier cannot show goods that match the order, do not accept that part of the load. The report stands: goods the supplier cannot match to the order leave the buyer with goods no supplier answers for.

← More shipping guides