Air Freight Delay and Damage Arrival Follow-Up Guide: From the Arrival Notice to the Carrier Answer

An air freight arrival that reads delayed, damaged or short is read line by line, and this guide walks from the notice to the carrier answer: read the arrival notice, the air waybill, the delay line and the damage line in order, so each line answers for the goods.
How to use this guide
This guide covers the air freight arrival follow-up only: reading the arrival notice beside the air waybill, naming the delay line and the damage line, reading the shortage line beside the damage line, and following the follow-up line to the carrier answer. It does not repeat the tracking guide, which reads the tracking milestones to the destination handover, or the damage checklist, which reads the inspection checks to the survey report, or the arrival notice page, which reads the buyer next steps when the notice arrives, or the booking checklist, which reads the booking to the carrier handover, or the insurance claims checklist, which reads the claim filing to the settlement decision.
Work through the five stages in order, and do not close the follow-up line before the arrival line stands settled in writing. An arrival line closed before the goods stand named may answer for goods it never names. The arrival notice, the air waybill, the arrival line, the delay line, the damage line, the shortage line and the follow-up line are the records the seller and the carrier read together. Each line is a record on the shipment, and each record is read beside the carrier answer. Each stage is read beside the arrival line, and each arrival read stands beside it.
Each stage keeps a record: note the arrival notice, the air waybill, the arrival line, the delay line, the damage line, the shortage line and the follow-up line. A stage with no record is a stage the shipment itself cannot answer for.
Stage 1 — Reading the arrival notice beside the air waybill
Read the arrival notice first: the arrival notice names the arrival, the seller and the arrival line, and the air waybill names the goods the seller sends beside the arrival. Read the arrival notice beside the air waybill, so the follow-up starts with the goods the seller names.
Where the arrival notice names an arrival the air waybill never names, note the difference, and ask the carrier in writing which goods the arrival answers for. Where the air waybill names no arrival line beside it, ask the carrier which arrival line the shipment answers for.
Stage 2 — Reading the delay line beside the arrival line
Read the delay line beside the arrival line: the delay line names the delay the arrival reads under, and the arrival line names the arrival the delay reads beside. Read the delay line, the arrival line and the air waybill together, so the delay answers for the goods the arrival line names. The delay line is the record the arrival line answers for.
Where the delay line names a delay the arrival line never names, note the difference, and ask the carrier in writing which delay the arrival answers for. Where the arrival reads with no delay line beside it, note the gap, and ask the carrier which delay line the arrival answers for.
Stage 3 — Reading the damage line beside the arrival line
Read the damage line beside the arrival line: the damage line names the damage the arrival reads under, and the arrival line names the arrival the damage reads beside. Read the damage line, the arrival line and the delay line together, so the damage answers for the goods the arrival line names. The damage line is the record the arrival line rests on.
Where the damage line names damage the arrival line never names, note the difference, and ask the carrier in writing which damage the arrival answers for. Where the arrival reads with no damage line beside it, note the gap, and ask the carrier which damage line the arrival answers for.
Stage 4 — Reading the shortage line beside the damage line
Read the shortage line beside the damage line: the shortage line names the goods the arrival never names, and the damage line names the damage beside the shortage line. Read the shortage line, the damage line and the arrival line together, so the shortage answers for the goods the damage line names. The shortage line is the record the damage line answers for.
Where the shortage line names goods the damage line never names, note the difference, and ask the carrier in writing which goods the shortage answers for. Where the shortage line reads with no arrival line beside it, note the gap, and ask the carrier which arrival line the shortage answers for.
Stage 5 — Reading the follow-up line beside the carrier answer
Read the follow-up line beside the carrier answer: the follow-up line names the carrier the goods travel with, and the carrier answer names the answer the goods answer for. Read the follow-up line, the carrier answer and the shortage line, so each reads the goods. The follow-up line is the record the carrier answer rests on.
Where the goods travel onward to the carrier, note the arrival line beside the follow-up line, and follow the goods onward to the carrier. Where the goods stay with the seller, ask the carrier in writing for the answer the goods answer for. A follow-up with no carrier answer beside it reads as unconfirmed.
Reading the arrival line, the delay line, the damage line, the shortage line and the follow-up line as one line from the arrival notice to the carrier answer
An air freight arrival that reads delayed, damaged or short is different from a line with no arrival line beside it: the arrival travels with the goods the seller names, and the goods are read through the arrival lines. The arrival line names where the follow-up starts, the delay line names the delay the arrival reads under, the damage line names the damage the arrival reads under, the shortage line names the goods the arrival never names, and the follow-up line names how the arrival stays true, and the five read together.
The arrival line is set from the goods the seller names: the arrival line the goods read in, the arrival line the delay line confirms beside the damage line, and the arrival line the shortage line answers for.
The delay line is read against the arrival line: the delay line the arrival names, the delay the delay line carries, and the arrival line the delay line answers for. A delay line with no arrival line beside it reads as a reply, not as an arrival line. The delay line is the record the arrival rests on.
A single arrival read with no arrival line beside it reads as a single read; the same arrival read in an air freight delay and damage arrival reads as a pattern, and a pattern asks a different question: what stands behind the arrival read. The reader notes the pattern on the arrival line, and the pattern answers for the goods the arrival line names, so the seller does not treat a pattern as single reads.
The damage line is read beside the arrival line: the damage line as it stands, the arrival line as it stands, and the goods as they stand beside the damage line. A damage line that names the damage reads the damage.
The shortage line is read beside the damage line: the shortage line the arrival names, the goods the shortage line carries, and the damage line the shortage line answers for. A shortage line with no damage line beside it reads as a line the arrival line cannot close, and the seller settles it with the carrier in writing before the goods travel onward.
The follow-up line stands beside the shortage line: the follow-up line the arrival names, the goods the follow-up line answers for, and the carrier the follow-up line rests on. The follow-up line is read against the arrival line the delay line first confirmed, and the settlement stands on the carrier note in writing.
The arrival line, the delay line, the damage line, the shortage line and the follow-up line are read together. The air freight delay and damage arrival ties each line to where the follow-up starts, the arrival line ties the line to the goods each arrival read carries, and the carrier answer ties the arrival back to the carrier the seller and the carrier read together. Where any link in that line is missing, it is settled with the carrier in writing before the goods travel onward. All five read together.
Which air freight arrival line to settle first when the arrival notice and the air waybill read differently
An air freight arrival line is settled against the arrival line; the arrival closes when the seller and the carrier read the arrival line together.
| Difference found | When it applies | What to do first |
|---|---|---|
| The arrival notice names goods the air waybill never names | The arrival notice and the air waybill read differently | Read the arrival notice, the air waybill and the arrival line together |
| The delay line names a delay the arrival line never names | The delay line and the arrival line read differently | Read the delay line, the arrival line and the air waybill together |
| The damage line names damage the arrival line never names | The damage line and the arrival line read differently | Read the damage line, the arrival line and the delay line together |
| The shortage line names goods the damage line never names | The shortage line and the damage line read differently | Read the shortage line, the damage line and the arrival line together |
| A follow-up line stands with no carrier answer beside it | The follow-up line leaves the air freight arrival with no carrier answer beside it | Read the follow-up line, the carrier answer and the arrival line together |
Why an air freight arrival waits open before the follow-up line closes
Most holds come back to a few causes. An arrival notice is named with no delay line beside it, so the arrival reads with no delay. A damage line is named with no shortage line beside it, so it reads only the damage. A shortage line is named with no carrier answer beside it, so it reads only the shortage.
The fix is the same in each case: name the arrival line, name the delay and the damage line, and put the answer on the follow-up line before the air freight arrival is closed.
Next is a seller that names no carrier note for an arrival the delay line names, then an arrival read that reads only the arrival.
What this air freight delay and damage arrival follow-up guide leaves open for the seller and the carrier
This guide cannot decide whether a carrier will carry a shipment the arrival line holds open: the carrier decides, and the seller confirms it.
It also cannot replace carrier or customs broker advice on a specific shipment. Where a carrier names a step this guide does not name, ask the carrier.
It also cannot say whether the goods the arrival line never read match the air waybill, or whether the arrival is answered with a claim or with a re-shipment. The carrier decides, and the seller confirms it with the carrier in writing.
Air freight guides on this site
- Air Freight Tracking Milestones Guide: From the Booking Line to the Destination Handover
- Cargo Damage Inspection Checklist: 30 Checks From Arrival to the Survey Report
- US Import Arrival Notice: What the Buyer Should Do When It Arrives
- Air Freight Booking Checklist: Direct, Consolidated & Carrier Handover
- International Freight Insurance Claims Checklist: Notice, Evidence, Filing & Settlement
- Air Freight Consolidation Guide: From the Loose Cartons to the ULD Build-Up and the House Air Waybill Split
Related guides
- Air Freight Tracking Milestones Guide: From the Booking Line to the Destination Handover
- Cargo Damage Inspection Checklist: 30 Checks From Arrival to the Survey Report
- US Import Arrival Notice: What the Buyer Should Do When It Arrives
- Air Freight Booking Checklist: Direct, Consolidated & Carrier Handover
- International Freight Insurance Claims Checklist: Notice, Evidence, Filing & Settlement
- Air Freight Consolidation Guide: From the Loose Cartons to the ULD Build-Up and the House Air Waybill Split
Official references
- US Customs and Border Protection: Trade
- ICC: Incoterms 2020
- FIATA: International Federation of Freight Forwarders Associations
- IATA: Cargo
For a route-specific logistics review, provide the product, origin, destination, packed dimensions, weight and ready date.
Request a shipment review ↗Frequently asked questions
What should be read first when an air freight arrival reads delayed, damaged or short?
Read the arrival notice first: the arrival notice names the goods, the air waybill and the arrival line, so the air freight arrival follow-up starts with the goods the seller names.
How should a delay line and a damage line be checked against the arrival line?
Read the delay line beside the arrival line, read the damage line beside the arrival line, and put the shortage line beside each line, so the delay line and the damage line answer for the goods the arrival line names. The arrival check reads each line beside the arrival line. The arrival check reads the shortage line beside the damage line.
What should be done when the arrival notice and the air waybill do not match?
Name the line the arrival notice leaves open, read it against the arrival line and the air waybill, and ask the carrier in writing for it.