Sourcing Arrival Inventory Check Follow-Up Guide: From the Inventory Count to the Inventory Record

The acceptance hands the goods to storage, and the inventory check starts there. This guide walks through the inventory check: count the goods into storage, record the bin location and the batch, read the inventory record against the acceptance record, follow the inventory difference, and close the inventory record.
How to use this guide
This guide covers the inventory check only: counting the goods into storage, recording the bin location and the batch, reading the inventory record against the acceptance record, following the inventory difference, and closing the inventory record. It does not repeat the sourcing arrival acceptance follow-up guide, which walks through the arrival count, the outer packaging check, the acceptance record and the exception follow-up the inventory check starts from, or the sourcing arrival acceptance exception claim exchange follow-up guide, which walks through the exception claim, the exchange, the reshipment or the refund, and the claim closure, or the sourcing inspection sampling guide, which walks through the first carton draw and the inspection report the inventory count is read beside, or the sourcing pre-shipment final inspection follow-up guide, which walks through the inspection request and the release decision or the rework decision the inventory check is read beside, or the sourcing inspection report filing and traceability follow-up guide, which walks through the report number and the report version, the photo evidence and the video evidence, and the finding trace the inventory record rests on, or the sourcing inspection pass release and shipment follow-up guide, which walks through the release confirmation and the shipment handover the goods are read beside once the inventory record stands.
Work through the five stages, and do not close the inventory record before the inventory difference stands settled. A record closed before the inventory difference stands settled may answer for cartons the order never names. The order, the inspection report, the acceptance record and the inventory record are the records the buyer and the supplier read.
Each stage keeps a record: note the inventory count, the bin location and the batch, and the inventory difference drawn from them. A stage with no record is a stage the inventory check cannot answer for.
Stage 1 — Counting the goods into storage
Count the goods into storage: count the cartons against the acceptance record they stand on, count the cartons against the order they answer for, and put the count beside the inventory record. Count the three together, so both read the same inventory count.
Where the count reads with cartons the acceptance record never names, note the cartons beside the inventory record, and hold the inventory check open until the count stands beside the acceptance record. Where the count reads with the order, note the reading beside the inventory record.
Stage 2 — Recording the bin location and the batch
Record the bin location and the batch: name the bin location the goods stand on, name the batch the goods answer for, and note the storage location beside the inventory record. Record the three together, so both read the same bin location and the same batch.
Where the bin location reads with no batch beside it, note it beside the inventory record, and hold the inventory check open until the batch stands beside the bin location. Where the batch reads with no bin location beside it, note it beside the inventory record, and hold the inventory check open until the bin location stands.
Stage 3 — Reading the inventory record against the acceptance record
Read the inventory record against the acceptance record: read the record against the order it stands on, read the record against the specification the order first confirmed, and note what the record settles beside the inventory line. Read the three together, so both read the same inventory record.
Where the inventory record settles the count, note the settlement beside the inventory record, and follow the inventory difference the record names. Where the inventory record holds the count open with no inventory line named, note the open line beside the inventory record, and ask the supplier in writing to settle it.
Stage 4 — Following the inventory difference
Follow the inventory difference: read the difference against the inventory count it answers for, read the difference against the acceptance record it stands beside, and note the difference beside the inventory record it closes. Follow the three together, so both read the same inventory follow-up.
Where the difference reads with cartons the inventory count never names, note the cartons beside the inventory record, and ask the supplier in writing to settle it before the difference stands. Where the difference stands with no bin location beside it, note it beside the inventory record, and keep the inventory check open until the difference stands settled.
Stage 5 — Closing the inventory record
Close the inventory record once the inventory count and the acceptance record read together: note the closure beside the inventory record it closes, note the inventory count, the bin location and the batch beside the order and the supplier, and tell the supplier in writing that the inventory record stands closed. A record closed against the inventory line reads as it stands.
Where the inventory record stands closed, note it beside the order, with the inventory count and the supplier note, and tell the supplier in writing. Where an inventory line still stands open, ask for it in writing before the inventory record is closed. Where the inventory record carries cartons the inspection report never names, note it beside the acceptance record.
Reading the inventory count, the bin location, the batch record, the inventory record and the inventory closure as one line from the acceptance record to the inventory record
An inventory check is different from an acceptance with no inventory record beside it: the inventory check travels with the goods the acceptance hands to storage, and the cartons and the outer packaging are read through the inventory record they carry. The inventory count names where the follow-up starts, the bin location names where the goods stand, the batch record names what the goods answer for, the inventory difference names what the count leaves open, and the inventory closure names where the follow-up ends, and the five are read together, with the supplier beside the buyer at each reading.
The inventory count is set from the goods at arrival because a count is not one record repeated: the count the cartons read in, the count the buyer confirms beside the acceptance record, and the last count the closed inventory record answers for before the closure. The count names the order behind it.
The inventory record is read against the acceptance record, not instead of it: the record the inventory count names, the cartons the record carries, and the order the record reads beside the inspection report. A carton with no record reads as a reply, not as a check, and a reply does not answer the goods. The inventory record is the record the inventory check rests on, and the record is read beside the acceptance record at each reading.
A single counted carton with no bin location reads as a single carton; the same unrecorded carton at each reading reads as a pattern, and a pattern asks a different question: what stands behind the goods on the order. The reader notes the pattern on the inventory record and names the cartons that carry it, so the buyer does not treat a pattern as single cartons.
The bin location is read beside the inventory record, not instead of it: the bin location as it stands, the record as it stands, and the cartons as they stand beside the bin location. A bin location read that names only the storage location reads only the storage location, and the goods go unread.
The inventory record is the line beside the acceptance record: the record the inventory count names, the cartons the record answers for, and the supplier the record rests on. The record is read against the specification the order first confirmed, and the settlement stands on the supplier note, in writing, before the closure.
The inventory count, the bin location, the batch record, the inventory record and the inventory closure are read together. The inventory check ties each order to where the follow-up starts, the count ties the order to the goods each inventory record carries, the bin location ties the count to the cartons each order carries, the batch ties the bin location to the goods that stand, and the inventory record ties the follow-up back to the inventory check set and closed. Where any link in that line is missing, it is settled with the supplier in writing before the closure. The record the closure leaves behind names the cartons, the inventory count and the supplier note together. All five read together.
Which inventory count difference to settle first when the inventory record and the acceptance record do not match
An inventory count difference is settled against the specification; the follow-up is closed when the supplier and the buyer read the same inventory record.
| Difference found | When it applies | What to do first |
|---|---|---|
| The inventory count names cartons the acceptance record never names | The inventory count and the acceptance record read differently | Read the inventory count, the acceptance record and the order together |
| The bin location names a shelf the inventory record never names | The bin location and the inventory record read differently | Read the bin location, the inventory record and the order together |
| The batch record names a batch the order never names | The batch record and the order read differently | Read the batch record, the inventory record and the order together |
| The inventory difference stands with no inventory line named | The difference leaves the follow-up neither followed up nor closed | Ask the supplier in writing which inventory line the difference answers for |
| An inventory record stands with no acceptance record beside it | The record leaves the inventory with no acceptance to answer for | Follow the inventory record to its acceptance record beside the order |
Why an inventory check is held back before the inventory record is closed
Most holds come back to a few causes. An inventory count is set with no acceptance record named, so the count reads with no record to answer for. A bin location is read with no batch named, so it reads only the storage location. An inventory difference is read only at the closure, so the goods go unread.
The fix is the same in each case: name the inventory count, name the bin location and the batch, and put the answer on the inventory record before the inventory check is closed.
Next is a supplier that names no supplier note for an inventory difference the acceptance record names, then an inventory check that reads only the cartons at the front.
What this sourcing arrival inventory check follow-up guide leaves open for the buyer and the supplier
This guide cannot decide whether a supplier will settle an inventory line the difference holds open: the supplier decides, and the buyer confirms it in writing.
It also cannot replace buyer or supplier advice on a specific order. Where a supplier names a step this guide does not cover, ask the supplier.
It also cannot say whether the goods the inventory check never touched match the order.
Sourcing and consolidation guides on this site
- Sourcing Arrival Acceptance Follow-Up Guide: From the Arrival Count to the Acceptance Record
- Sourcing Arrival Acceptance Exception Claim Exchange Follow-Up Guide: From the Evidence Pack to the Claim Closure
- Sourcing Inspection Sampling Guide: From the First Carton Draw to the Inspection Report
- Sourcing Pre-Shipment Final Inspection Follow-Up Guide: From the Inspection Request to the Shipment Handover
- Sourcing Inspection Report Filing and Traceability Follow-Up Guide: From the Filed Report to the Traced Finding
- Sourcing Inspection Pass Release and Shipment Follow-Up Guide: From the Release Confirmation to the Shipment Handover
Related guides
- Sourcing Inventory Discrepancy and Cycle Count Follow-Up Guide: From the Discrepancy Classification to the Count Record
- Sourcing Arrival Acceptance Follow-Up Guide: From the Arrival Count to the Acceptance Record
- Sourcing Arrival Acceptance Exception Claim Exchange Follow-Up Guide: From the Evidence Pack to the Claim Closure
- Sourcing Inspection Sampling Guide: From the First Carton Draw to the Inspection Report
- Sourcing Pre-Shipment Final Inspection Follow-Up Guide: From the Inspection Request to the Shipment Handover
- Sourcing Inspection Report Filing and Traceability Follow-Up Guide: From the Filed Report to the Traced Finding
- Sourcing Inspection Pass Release and Shipment Follow-Up Guide: From the Release Confirmation to the Shipment Handover
Official references
- US Customs and Border Protection: Trade
- ICC: Incoterms 2020
- FIATA: International Federation of Freight Forwarders Associations
- IATA: Cargo
For a route-specific logistics review, provide the product, origin, destination, packed dimensions, weight and ready date.
Request a shipment review ↗Frequently asked questions
What should be counted first when the acceptance hands the goods to storage?
Count the goods into storage first: count the cartons against the acceptance record and the order, note the bin location and the batch beside the inventory record, and keep the inventory check open until the inventory count stands, so the buyer and the supplier read the same inventory record.
How should the bin location and the batch be recorded?
Record the bin location and the batch beside the inventory record: name the bin location, name the batch, and name the storage location the goods stand on, and ask the supplier in writing to settle any line the inventory record leaves open before the inventory check is followed up.
What should be done when the inventory count and the acceptance record do not match?
Name the inventory difference the count leaves open, read it against the inventory count and the acceptance record, and ask the supplier in writing for it.