MAWB and HAWB Consistency Checklist: 30 Checks Before the Cargo Is Accepted

Read the master air waybill against the house air waybill before the cargo is accepted: the master names the consolidation the carrier carries, the house names the shipment inside it, and the two have to name the same parties, the same pieces and the same goods line by line.
How to use this checklist
This page covers the master air waybill read against the house air waybill only: the shipper, the consignee and the notify party read line by line, the pieces, the weight and the volume read line by line, the goods description read line by line, and the origin, the destination and the freight terms read line by line. It does not repeat the air freight booking checklist, the dangerous goods air freight checklist or the bill of lading checklist.
Work through the four stages in order, with the master waybill, the house waybill and the booking open on the desk. Read every line on the master first, then read the same line on the house, and mark the line only when the two read the same.
The carrier, the forwarder and the consignee each read a different part of the pair, so a house waybill read on its own is not a record the carrier can accept. Keep the master and the house together in one file, and hand the pair over whole.
Stage 1 — Shipper, consignee and notify party read line by line
Stage 1 covers the shipper, the consignee and the notify party read line by line: the names and the addresses on the master compared with the names and the addresses on the house. A notify party named on one waybill and missing from the other is the gap found most often.
Read the parties on the master first, then read the same parties on the house. Where a name reads differently on the two waybills, ask the forwarder in writing before the cargo is accepted.
Stage 2 — Pieces, weight and volume read line by line
Stage 2 covers the pieces, the weight and the volume read line by line: the count, the weight and the volume on the master compared with the count, the weight and the volume on the house. A piece count that reads differently on the two waybills is the gap found most often.
Read the pieces, the weight and the volume on the master first, then read the same lines on the house. Where a count reads differently on the two waybills, ask the forwarder in writing before the cargo is accepted.
Stage 3 — Goods description, marks and handling notes read line by line
Stage 3 covers the goods description, the marks and the handling notes read line by line: the description on the master compared with the description on the house, and the marks compared with the marks on the packing list. A description that reads differently on the two waybills is the gap found most often.
Read the description on the master first, then read the same description on the house. Where a mark reads differently on the two waybills, ask the shipper in writing before the cargo is accepted.
Stage 4 — Origin, destination, flight and freight terms read line by line
Stage 4 covers the origin, the destination, the flight and the freight terms read line by line: the airports and the flight on the master compared with the airports and the flight on the house. A destination that reads differently on the two waybills is the gap found most often.
Read the routing on the master first, then read the same routing on the house. Where a freight term reads differently on the two waybills, ask the forwarder in writing before the cargo is accepted.
Reading the master and the house waybill as one line from the booking to the delivery
The master and the house waybill are read as one line from the booking to the delivery, and a break anywhere in the line breaks the whole read. The booking names the shipment the forwarder is asked to carry, the master names the consolidation the carrier carries, and the house names the shipment inside it. Each line on the house answers a line on the master: the parties answer the parties, the pieces answer the pieces, and the goods answer the goods.
The master is the first place where the line holds together. A master waybill names the consolidation as a whole: the shipper who hands the consolidation over, the pieces that went into it, and the destination where the carrier hands it over. Where a house waybill names a party the master does not name, the line breaks the other way: the carrier reads one shipper on the master and another on the house, and the cargo is held until the forwarder says in writing which name stands.
The house is the second place where the line holds together, and it is the place the master cannot reach. A house waybill names the shipment inside the consolidation: the consignee who takes it, the pieces that belong to it, and the goods as the shipper described them. Where the house names a piece count the master does not name, the file breaks the other way: the count on the master and the count on the house have to be read against each other before the cargo is accepted.
The pair is handed over whole, and the handover is the last place where the line is read before the cargo is accepted. The master and the house carry the same booking reference, the pieces on the house read against the pieces on the master, and the freight term on the house reads against the freight term on the master. A house waybill read on its own says nothing about whether the carrier can accept it until the pair is read together.
Which line to settle first when the master and the house waybill read differently
A line the master and the house do not agree on is settled with the forwarder, and a party or a count that reads differently is settled with the shipper or the carrier.
| Difference found | When it applies | What to do first |
|---|---|---|
| Shipper name on the house reading differently from the master | The two waybills name different shippers | Ask the forwarder in writing which shipper name stands |
| Piece count on the house reading differently from the master | The two waybills name different piece counts | Ask the shipper in writing which piece count stands |
| Goods description on the house reading differently from the master | The two waybills describe the goods differently | Ask the shipper in writing which description stands |
| Freight term on the house reading differently from the master | The two waybills name different freight terms | Ask the forwarder in writing which freight term stands |
Why a master and house waybill pair is sent back before the cargo is accepted
Most master and house waybill pairs sent back before the cargo is accepted come back to the same few causes. The shipper name on the house reads differently from the shipper name on the master, so the carrier has no agreed shipper to read the handover against. A piece count on the house reads differently from the piece count on the master, so the receiver has no agreed count to read the arrival against.
The fix is the same in each case: read the master first, read the same line on the house, and ask the forwarder in writing which line stands before the cargo is accepted.
A second cause is a goods description on the house that reads differently from the master. A third is a freight term on the house that reads differently from the master. A fourth is a house waybill with no booking reference, so the pair cannot be read against the booking.
A fifth cause is a pair handed over with the master on one desk, the house on another, and no booking beside them. Keep the master, the house and the booking in one file, and hand the pair over whole.
What this master and house waybill consistency checklist cannot settle for the carrier and the forwarder
This checklist cannot decide whether the goods fit a consolidation the master waybill does not name: the carrier and the forwarder decide that from the booking and the written answers.
It also cannot replace carrier or forwarder advice on a specific shipment. Where a shipment names a step this checklist does not cover, ask the carrier or the forwarder in writing.
It also cannot say whether the goods match the description on the packing list: that rests with the packing list check.
Air freight guides on this site
- Air Freight Booking Checklist: Direct, Consolidated & Carrier Handover
- Dangerous Goods Air Freight Checklist: Documents, Packaging & Carrier Acceptance
- Bill of Lading Checklist: Parties, Freight Terms, Clean Bill & Originals
- Bill of Lading and Packing List Consistency Checklist: 30 Cross-Checks Before Issue
- Telex Release / Sea Waybill Checklist: 30 Checks Before the Goods Are Released
- Air Freight from China: Complete Guide
Related guides
- Air Freight Booking Checklist: Direct, Consolidated & Carrier Handover
- Dangerous Goods Air Freight Checklist: Documents, Packaging & Carrier Acceptance
- Bill of Lading Checklist: Parties, Freight Terms, Clean Bill & Originals
- Bill of Lading and Packing List Consistency Checklist: 30 Cross-Checks Before Issue
- Telex Release / Sea Waybill Checklist: 30 Checks Before the Goods Are Released
- Air Freight from China: Complete Guide
Official references
- US Customs and Border Protection: Trade
- ICC: Incoterms 2020
- FIATA: International Federation of Freight Forwarders Associations
- IATA: Cargo
For a route-specific logistics review, provide the product, origin, destination, packed dimensions, weight and ready date.
Request a shipment review ↗Frequently asked questions
What should be read first when the master and the house waybill arrive together?
Read the master first: the shipper, the consignee and the notify party, the pieces, the weight and the volume, and the goods description. Then read the same lines on the house, and mark each line only when the two read the same.
Why read the house waybill against the master instead of reading it on its own?
A house waybill read on its own says nothing about the consolidation it travels in. Read against the master, it shows whether the shipment inside the consolidation is the shipment the carrier is asked to carry.
How should the master and the house waybill be handed over?
Keep the master, the house and the booking in one file, with the same booking reference on each. Hand the pair over whole before the cargo is accepted, so the carrier reads the two waybills together.